Studioparallel

NHS NSS Glasgow – Reception Pod in existing atrium

Posted in Current by pierre forissier on October 17, 2009

NHS pano 01 copy_tone

Advertisements
Tagged with:

Fife Institute of Physical & Recreational Activity

Posted in Current by pierre forissier on October 15, 2009

G render 09 copy copy

Position: Design & Project Architect for cre8architecture

Client: Fife Council

Design/Planning submission/Tender information coordination

Construction value: £23m

Traditional contract

Completion: March 2011


G render 06 copy

The strong design form uses the various volumes of space to create dynamic forms which respond in a contemporary way to the varying scales of the surrounding landscape.Radical openings” to the the landscape afford views into and out of the building with dramatic effect, particularly at night. The proposals provide a new leisure facility in Glenrothes designed to re-energise the town and reinforce the future master planning opportunities in terms of linkages and public realm. The project has been approved for planning in August 2009 and is due for completion in Autumn 2011.


Tagged with:

Research /// Weaving

Posted in Research, Structure by pierre forissier on October 15, 2009

weave 01

Weaving space constructed by local operations involving changes of directions. These changes in direction may be due to the nature of the applied forces or to the variability of the goal.

weave 02


Tagged with: ,